360MW Hydro Power Plant at Silvermines, North Tipperary, Ireland is On Course to Operate in 2028

Report by Kevin O’Sullivan in The Irish Times, The only existing pumped storage facility in Ireland, Turlough Hill produces 292MW.

Leave a Reply

Your email address will not be published. Required fields are marked *